Dallas, Texas & Maidenhead, England, Aug 1991–Apr 1999

Wireless Systems Engineering - Tools development (5 Aug 1996–1 Apr 1999)

Responsible for the design and implementation of a GUI front end and utilities for a BSS capacity analysis tool called 'CT7100'. Coordinated with database designers in India, marketing in France and customers in Ireland. Mentored and trained peers on the application architecture and development methodologies. (HP-UX, Sun Solaris, C++, ILOG, Ingres/Sybase, perl).

Researched, analysed and implemented two releases of a capacity analysis tool for MSC/HLR switches called 'Adept-G'. Provided technical support for internal and external customers (HP-UX/Mac, VisualWorks Smalltalk).

GSM call processing re-architecture (16 Oct 1995–2 Aug 1996)

Part of a small team of senior engineers chosen to develop a new object oriented call processing architecture. Influenced several areas of the initial design and played a key role in supplementary services development. Final architecture became one of the most successful major software re-works in Nortel switching (HP-UX, Protel-II).

GSM supplementary services development (12 Oct 1994–12 Oct 1995)

Implemented enhanced functionality for the GSM Multi-Party supplementary service and provided support in established areas of expertise (GSM MAP/TCAP, HP-UX, Protel).

MSC/TSC SS7 signalling development (12 Aug 1991–12 Oct 1994)

Completed several software features encompassing many areas of Nortel switching, demonstrated the ability to research, analyse, coordinate, develop, document, test and debug. In particular the re-development of an SS7 signalling system (BTUP) onto a new base call processing architecture. Acquired an advanced understanding of the GSM product and Nortel's large-scale development environment (HP-UX, Protel, Pascal).

Features:
  • Introduced and supported Echo Cancellers on the DMS MSC/TSC.
  • Integrated and Tested the DTCO+ Hardware for GSM switches.
  • Q767 (ISUP variant) documentation.
  • ISUP signalling support.
  • Redesigned and supported BTUP for the MSC, using the NXCP architecture.

Nortel Networks Training

During my time at Nortel Networks I was placed on over 40 days worth of training covering technical courses, self-improvement courses, and management courses. Over the last few years at Nortel Networks I also embarked on a plan of self-education through reading and personal projects.

DateTimeStatusCodeTitleDaysLocation
10 Dec 1991 8:30 COMPLETE UE1045 MGTS 2.0 MAID
17 Jan 1992 9:30 COMPLETE UQ1001 EXCELLENCE! CASCADE/ORIENTATION 0.5 MAID
28 Jan 1992 8:30 COMPLETE UM1005 Time Manager 2.0 MAID
16 Jul 1992 13:30 COMPLETE UT2004 Code Inspection 0.5 MAID
26 Aug 1992 9:30 COMPLETE UP7014 XPM Software Design 5.0 MAID
26 Aug 1992 9:30 CANCEL UP7201 Table Control 0.0 MAID
08 Sep 1992 9:00 COMPLETE UQ1002 EXCELLENCE! through CONT. IMPROV 2.0 MAID
03 Nov 1992 9:30 COMPLETE UT2000 GSM Overview 1.0 MAID
08 Feb 1993 9:30 COMPLETE UE1400 Responding Effectively 3.0 MAID
19 Mar 1993 8:30 COMPLETE UP7501 Centrex Traffic (BNR) 0.5 MAID
15 Jun 1993 8:30 COMPLETE UE2357 Requirements Engineering 1.0 HARL
07 Jul 1993 8:30 COMPLETE UE1371 Problem Solving and Decision Mak 3.0 HARL
09 Mar 1994 8:30 COMPLETE UQ1009 DPP 1.0 OTT
09 Feb 1995 8:30 COMPLETE DP7100 FPE-FEATURE PROCESSING ENVIRONME 1.0 RICH
02 Mar 1995 8:30 COMPLETE DT1122 STEAM 2.0 RICH
08 Mar 1995 8:30 COMPLETE DC4200 C++/OBJECT ORIENTED PROGRAMMING 3.0 RICH
08 Oct 1996 1:00 COMPLETE DT1006 INTELLECTUAL PROPERTY SEMINAR 0.5 RICH
29 Oct 1996 COMPLETE OC9057 ProSTAR Fundamentals Self-Paced 0.5 OTT
25 Feb 1997 8:30 COMPLETE DC4625 JAVA PROGRAMMING 4.0 RICH
29 May 1997 9:30 COMPLETE DI1017 CREATIVITY FOR BREAKTHROUGH SOLU 1.0 RICH
04 Jun 1997 2:00 COMPLETE DI5001 INTEGRITY/GENERAL COLIN POWELL 0.3 RICH
11 Jun 1997 8:30 COMPLETE DC4626 JAVA APPLETS 4.0 RICH
18 Jul 1997 8:30 COMPLETE DC4202 LARGE SCALE C++ 1.0 RICH
30 Jul 1997 8:30 COMPLETE DT1020 EMERGING COMMUNICATION TECHNOLOG 1.0 RICH
20 Aug 1997 8:30 COMPLETE DC4104 OBJECT ORIENTED ANALYSIS & DESIG 3.0 RICH
27 Aug 1997 2:00 NO SHOW DI5002 VISION/FORMER PRESIDENT GEORGE B 0.0 RICH
11 Sep 1997 8:30 CANCEL DT7025 RF ENGINEERING 0.0 RICH
16 Oct 1997 2:00 COMPLETE DI5003 ENDURANCE/GENERAL H. NORMAN SCHW 0.4 RICH
02 Dec 1997 8:30 CANCEL DM3678 TECHNICAL (R & D) PROJECT MANAGE 0.0 RICH
08 Oct 1998 9:30 COMPLETE DM1103 BUDDY TRAINING 0.5 RICH
TOTAL: 43.7 DAYS
AKA: Nortel, BNR, Bell Northern Research